Alencar, F., & Castro, J. (1999). Integrating Early and Late-Phase Requirements: A Factory Case Study. In Anais do XIII SimpĆ³sio Brasileiro de Engenharia de Software, (pp. 33-47). Porto Alegre: SBC. doi:10.5753/sbes.1999.23913