Integration of Story Points and Use Case Points in Projects Based on SCRUM and CMMI
Abstract
Developing reliable estimates is one of the most critical aspects in software development. The adoption of agile methods and small iterations bring new challenges to estimation processes and the CMMI model implementation, such as low information availability or low level of technical detail, high team involvement in the estimation process and a tight schedule to come up with estimates. The case presented in this paper describes how Instituto Atlântico has implemented Story Points estimates in a context of high maturity CMMI level (levels 4 and 5) using Use Case Points based historical data.
Keywords:
Story Points, Use Case Points, SCRUM, CMMI
References
Ambler, S, Jeffries, R., Agile Modeling: Effective Practices for Extreme Programming and the Unified Process. Wiley, 2002.
Cohn, M. (2006) Agile Estimating and Planning, Prentice Hall, 330 p.
Chrissis, M.B., Konrad, M., Shrum, S. CMMI Second Edition Guidelines for Process Integration and Product Improvement. Version 1.2. Addison-Wesley, 2006.
Gloger, B (2007) The Zen of Scrum, http://www.glogerconsulting.de.
Karner, G. (1993) Metrics for Objectory. Diploma thesis, University of Linköping, Sweden. No. LiTH-IDA-Ex-9344:21.
Marçal, A., Freitas, B., Soares, F., Maciel, T. Belchior, A. (2007). Estendendo o SCRUM segundo as Áreas de Processo de Gerenciamento de Projetos do CMMI, CLEI 2007, San Jose, Costa Rica.
Monteiro, T. C., Pires, C. G. S., Belchior, A. D., (2005) “TUCP: Uma Extensão da Técnica UCP”, IV Simpósio Brasileiro de Qualidade de Software, Porto Alegre.
Schwaber, K. (2004) Agile Project Management With Scrum, Microsoft Press, Redmond, Washington, USA.
Tayntor, Christine B. (2003) “Six Sigma Software Development”, Flórida, Auerbach.
Cohn, M. (2006) Agile Estimating and Planning, Prentice Hall, 330 p.
Chrissis, M.B., Konrad, M., Shrum, S. CMMI Second Edition Guidelines for Process Integration and Product Improvement. Version 1.2. Addison-Wesley, 2006.
Gloger, B (2007) The Zen of Scrum, http://www.glogerconsulting.de.
Karner, G. (1993) Metrics for Objectory. Diploma thesis, University of Linköping, Sweden. No. LiTH-IDA-Ex-9344:21.
Marçal, A., Freitas, B., Soares, F., Maciel, T. Belchior, A. (2007). Estendendo o SCRUM segundo as Áreas de Processo de Gerenciamento de Projetos do CMMI, CLEI 2007, San Jose, Costa Rica.
Monteiro, T. C., Pires, C. G. S., Belchior, A. D., (2005) “TUCP: Uma Extensão da Técnica UCP”, IV Simpósio Brasileiro de Qualidade de Software, Porto Alegre.
Schwaber, K. (2004) Agile Project Management With Scrum, Microsoft Press, Redmond, Washington, USA.
Tayntor, Christine B. (2003) “Six Sigma Software Development”, Flórida, Auerbach.
Published
2009-06-01
How to Cite
MARÇAL, Ana Sofia C.; BEZERRA, Carla Ilane Moreira; PIRES, Carlo Giovano da Silva; COELHO, Ciro; SOUZA, Gabriela Telles de; BARBOSA, Joice.
Integration of Story Points and Use Case Points in Projects Based on SCRUM and CMMI. In: BRAZILIAN SOFTWARE QUALITY SYMPOSIUM (SBQS), 8. , 2009, Ouro Preto.
Anais [...].
Porto Alegre: Sociedade Brasileira de Computação,
2009
.
p. 365-372.
DOI: https://doi.org/10.5753/sbqs.2009.15528.