A Configuration Management process proposal based on CMMI level 2 interned for Product Oriented Software Factories
Abstract
The search for services and products quality improvement has increased in the last few years. To take care of the pressure exerted by the market, the software companies have invested in the professionalization of its operations, using product and project-oriented software factory concepts, and software development and process improvement, using quality models like CMMI. In this context, configuration management is a very important activity in project and product development in a company. This research work presents a configuration management process proposal, which is compliant with maturity and capability level 2 of CMMI Configuration Management process area, applied to product-oriented software factories.
Keywords:
Configuration Management, CMMI, Software House
References
Aaen, I., Botcher, P. e Mathiassen, L. (1997) “The Software Factory: Contributions and Illusions.” In: Proceedings of the Twentieth Information Systems Research Seminar in Scandinavia, Oslo, 1997.
Aberdeen Group, Inc. (2007) “The Configuration Management Benchmark Report – Formalizing and Extending CM to Drive Quality”. Massachusetts, February 2007.
Chrissis, M. B., Konrad, M. e Shrum, S. (2003) “CMMI: Guidelines for 1Process Integration and Product Improvement”. Pearson Education, 2003.
Esublier, J. (2000) “Software Configuration Management: A Roadmap”. In Proceedings of the Conference of The Future of Software Engineering, p.279-289, June 04-11. Limerick, Ireland, 2000. http://doi.acm.org/10.1145/336512.336576, último acesso – junho/2007.
Farah, J. (2004) “Changes: The Crossroads Between Project CM and Product CM”. CM Crossroads, October, 2004. http://www.cmcrossroads.com/content/view/6727/238/, último acesso – abril/2007.
Fernandes, A. A. e Teixeira, D. S. (2004) “Fábricas de Software: Implantação e Gestão de Operações”. São Paulo – Atlas, 2004.
Guess, V. (1998). “What’s New in CM?” Institute of Configuration Management Scottsdale, 1998. http://www.icmhq.com/newsviews/Whats%20New%20in%20CM.html, último acesso - junho/2007.
Junk, W. S. (2000) “The Dynamic Balance Between Cost, Schedule, Features, and Quality in Software Development Projects”. Moscow, 2000.
Kasse, T. e McQuaid, P. A. (2000) “Software Quality Professional”. American Society for Quality. September, 2000. http://www.asq.org/pub/sqp/past/vol2_issue4/mcquaid.html, último acesso – junho/2007.
Lim, N., Ang, S. K. J. e Pavri, F.N. (1999) “Diffusing Software-based Technologies with a Software Factory Approach for Software Development: A Theoretical Framework”. Department of Decision Sciences, Faculty of Business Administration, National University of Singapore, Republic of Singapore, 1999.
Mantis Bug Tracker (2007). http://www.mantisbt.org/, último acesso – maio/2008.
Oliveira, K. C. A. (2007) “Um processo de Gerência de Configuração baseado no nível 2 do CMMI estagiado para Fábricas de Software Orientadas a Produto”. Dissertação de Mestrado, Universidade Federal de Pernambuco, Agosto 2007.
Software Engineering Institute - CMU/SEI-2002-TR-028 (2002) “Capability Maturity Model Integration, Version 1.1 – CMMI for Software Engineering (CMMI-SW, V1.1) Continuous Representation”. Carnegie Mellon University, August 2002.
Software Engineering Institute - CMU/SEI-2002-TR-029 (2002) “Capability Maturity Model Integration, Version 1.1 – CMMI for Software Engineering (CMMI-SW, V1.1) Staged Representation”. Carnegie Mellon University, August 2002.
The Standish Group International (2001) “Extreme CHAOS 2001”. February 2001. http://www.vertexlogic.com/processOnline/processData/documents/pdf/extreme_chaos.pdf, último acesso – junho/2006.
The Standish Group Web Site (2007), http://www.standishgroup.com/, último acesso – junho/2007.
The Standish Group International (1995) “Chaos Report (1994)”. http://www.standishgroup.com/sample_research/chaos_1994_1.php, último acesso – junho/2007.
Tachizawa, T. e Scaico, O. (1997) “Organização Flexível: Qualidade na gestão por processos”. São Paulo – Atlas, 1997.
Aberdeen Group, Inc. (2007) “The Configuration Management Benchmark Report – Formalizing and Extending CM to Drive Quality”. Massachusetts, February 2007.
Chrissis, M. B., Konrad, M. e Shrum, S. (2003) “CMMI: Guidelines for 1Process Integration and Product Improvement”. Pearson Education, 2003.
Esublier, J. (2000) “Software Configuration Management: A Roadmap”. In Proceedings of the Conference of The Future of Software Engineering, p.279-289, June 04-11. Limerick, Ireland, 2000. http://doi.acm.org/10.1145/336512.336576, último acesso – junho/2007.
Farah, J. (2004) “Changes: The Crossroads Between Project CM and Product CM”. CM Crossroads, October, 2004. http://www.cmcrossroads.com/content/view/6727/238/, último acesso – abril/2007.
Fernandes, A. A. e Teixeira, D. S. (2004) “Fábricas de Software: Implantação e Gestão de Operações”. São Paulo – Atlas, 2004.
Guess, V. (1998). “What’s New in CM?” Institute of Configuration Management Scottsdale, 1998. http://www.icmhq.com/newsviews/Whats%20New%20in%20CM.html, último acesso - junho/2007.
Junk, W. S. (2000) “The Dynamic Balance Between Cost, Schedule, Features, and Quality in Software Development Projects”. Moscow, 2000.
Kasse, T. e McQuaid, P. A. (2000) “Software Quality Professional”. American Society for Quality. September, 2000. http://www.asq.org/pub/sqp/past/vol2_issue4/mcquaid.html, último acesso – junho/2007.
Lim, N., Ang, S. K. J. e Pavri, F.N. (1999) “Diffusing Software-based Technologies with a Software Factory Approach for Software Development: A Theoretical Framework”. Department of Decision Sciences, Faculty of Business Administration, National University of Singapore, Republic of Singapore, 1999.
Mantis Bug Tracker (2007). http://www.mantisbt.org/, último acesso – maio/2008.
Oliveira, K. C. A. (2007) “Um processo de Gerência de Configuração baseado no nível 2 do CMMI estagiado para Fábricas de Software Orientadas a Produto”. Dissertação de Mestrado, Universidade Federal de Pernambuco, Agosto 2007.
Software Engineering Institute - CMU/SEI-2002-TR-028 (2002) “Capability Maturity Model Integration, Version 1.1 – CMMI for Software Engineering (CMMI-SW, V1.1) Continuous Representation”. Carnegie Mellon University, August 2002.
Software Engineering Institute - CMU/SEI-2002-TR-029 (2002) “Capability Maturity Model Integration, Version 1.1 – CMMI for Software Engineering (CMMI-SW, V1.1) Staged Representation”. Carnegie Mellon University, August 2002.
The Standish Group International (2001) “Extreme CHAOS 2001”. February 2001. http://www.vertexlogic.com/processOnline/processData/documents/pdf/extreme_chaos.pdf, último acesso – junho/2006.
The Standish Group Web Site (2007), http://www.standishgroup.com/, último acesso – junho/2007.
The Standish Group International (1995) “Chaos Report (1994)”. http://www.standishgroup.com/sample_research/chaos_1994_1.php, último acesso – junho/2007.
Tachizawa, T. e Scaico, O. (1997) “Organização Flexível: Qualidade na gestão por processos”. São Paulo – Atlas, 1997.
Published
2008-06-02
How to Cite
OLIVEIRA, Karine C. A.; VASCONCELOS, Alexandre M. L..
A Configuration Management process proposal based on CMMI level 2 interned for Product Oriented Software Factories. In: BRAZILIAN SOFTWARE QUALITY SYMPOSIUM (SBQS), 7. , 2008, Florianópolis.
Anais [...].
Porto Alegre: Sociedade Brasileira de Computação,
2008
.
p. 295-309.
DOI: https://doi.org/10.5753/sbqs.2008.15550.
