Development of a Software Process Adhering to ISO 9001: 2000 Based on the Agile Scrum Process

  • Antônio F. dos Santos Jr. UFAM
  • Vandermi J. da Silva UFAM
  • Vicente F. de Lucena Jr. UFAM

Abstract


This paper describes how the research and development department of a mobile devices company developed a process compliant to ISO 9001:2000 for use in Scrum-based projects in software development, based on the experience and history in the use of this agile process in former projects, maintaining its quality system compliant to ISO 9001:2000, getting certified in this standard, and improving its projects performance.
Keywords: Software Process, ISO 9001: 2000, Scrum

References

ABNT (2001) “NBR ISO 9001 Sistemas de Gestão da Qualidade – Requisitos”. ABNT CE-25:002.18 – Comissão de Estudos de Sistemas da Qualidade, Brasil.

Chrissis, M., Konrad, M. e Shrum, S. (2003) “CMMI(R): Guidelines for Process Integration and Product Improvement”. 2nd Edition. The SEI Series in Software Engineering. Addison Wesley Press, United States.

GForge (2008) “GForge Collaborative Development Environment”. http://gforge.org/, Março, 2008.

Land, S. e Walz (2006) “Practical Support for ISO 9001 Software Project Documentation”. IEEE Computer Science, John Wiley and Sons Inc., United States.

Larman, Craig (2004) “Agile and Iteractive Development: a manager ́s guide”, Pearson Education Inc., United States.

McMichael, B. e Lombardi, M (2007) “ISO 9001 and Agile Development”, In Agile 2007 Conference (Agile 2007), pp. 262-265, IEEE Computer Society, ISBN 0-7695- 2872-4.

Messer, T. et Al (1998) “Siemens Process Assessment and Improvement Approaches: Experiences and Benefits”, In Computer Software and Applications Conference, 1998. COMPSAC '98 Proceedings. The Twenty-Second Annual International 19-21 Aug. 1998, pp. 186-195, DOI 10.1109/CMPSAC.1998.716655.

Ruby, K. (2007) “Scrum Alliance Certifications”, http://www.Scrumalliance.org/articles/67, Março, 2008.

Santos Jr., A. F. e Yellayi, S. (2007) “Software Process Improvement in an outsourced

EPG environment”, In SEPG 2007 - 19th annual SEPG, United States.

Schwaber, K. e Beedle, M. (2002) “Agile Software Development with Scrum”, Prentice Hall. United States.

Scrumworks (2008) “ScrumWorks - Scrum Lifecycle Management Tools”, Danube Technologies. http://www.danube.com/Scrumworks, Março, 2008.

Siemens CT (2008) Siemens AG – Corporate Technology. https://www.ct.siemens.com/en/home/, Março, 2008.

Siemens USA (2008) Siemens USA – Siemens Corporate Research, http://www.usa.siemens.com/en/research/, Março, 2008.
Published
2008-06-02
DOS SANTOS JR., Antônio F.; DA SILVA, Vandermi J.; LUCENA JR., Vicente F. de. Development of a Software Process Adhering to ISO 9001: 2000 Based on the Agile Scrum Process. In: BRAZILIAN SOFTWARE QUALITY SYMPOSIUM (SBQS), 7. , 2008, Florianópolis. Anais [...]. Porto Alegre: Sociedade Brasileira de Computação, 2008 . p. 359-367. DOI: https://doi.org/10.5753/sbqs.2008.15556.