Proposal and application of an instrument to monitor the implementation of SW-CMM Level 2
Abstract
The Capability Maturity Model for Software has been used by many organizations as a way to improve its software processes. The aim of this paper is to present an instrument (questionnaire) developed to track the SW- CMM Level 2 implantation process and to describe an experience about its application. The instrument developed and a critical analyses of the results obtained by the instrument application are presented as contribution.
Keywords:
monitoring, implementation, SW-CMM Level 2
References
GIL, A. Métodos e técnicas de pesquisa social. São Paulo: Atlas, 1995.
YIN, R. Estudo de Caso: Planejamento e Métodos. Porto Alegre: Bookman, 2001.HOPPEN, N. Evaluation research of article in Information Systems: Proposal of one guide. XXI ANPAD Proceedings: Rio de Janeiro, 1997.
YIN, R. Estudo de Caso: Planejamento e Métodos. Porto Alegre: Bookman, 2001.HOPPEN, N. Evaluation research of article in Information Systems: Proposal of one guide. XXI ANPAD Proceedings: Rio de Janeiro, 1997.
Published
2005-06-06
How to Cite
MARCZAK, Sabrina; AUDY, Jorge; SÁ, Luciana.
Proposal and application of an instrument to monitor the implementation of SW-CMM Level 2. In: BRAZILIAN SOFTWARE QUALITY SYMPOSIUM (SBQS), 4. , 2005, Porto Alegre-RS.
Anais [...].
Porto Alegre: Sociedade Brasileira de Computação,
2005
.
p. 316-324.
DOI: https://doi.org/10.5753/sbqs.2005.16174.